When the installation of a roof window is not possible, there is another solution: the reflecting tunnel. He lets daylight into the blind rooms of the house. Another advantage to the key: energy savings!

Create a skylight

A natural light pipe: the project

The roof window remains the most common means of bringing natural light into the attic. But how to light a blind room? Laundry room, toilets, dressing room, hallway... generally have no openings and require artificial lighting. The solution: create a light entry through the roof.

The system presented here combines a small roof frame, a reflective duct and a ceiling light. On the outside, the roof-to-ceiling integration remains discreet. There are chassis adapted to each type of cover. Inside, the diffuser integrated in the ceiling looks like a large recessed spot... that consumes nothing!

A flexible or rigid conduit?

This amazing natural lighting system comes in two versions: with flexible or rigid duct.
• In a flexible version, the distance between the roof frame and the ceiling diffuser can be up to 2 meters. This is the system shown here ("Sun Tunnel" by Velux, supplied as a kit with an integrated seal fitting).
• More efficient, the rigid conduit carries this distance to 6 meters. In addition to the greater distance, the rigid conduit also offers better lighting power, with a light output of 6,500 lumens, against 2,100 lumens in a flexible version.

Installation conditions

The distance between the roof and the ceiling determines the choice of the most suitable duct. If the integration on the roof does not pose any particular problem, it is necessary especially to think about the passage of the conduit. The non-convertible attic of a single-storey house or attic space remains the most discreet crossing points.

A natural light pipe: the realization

Create an opening on the roof

Create an opening on the roof

The frame is discreet (placed here in the axis of an existing roof window). Remove the tiles and battens on the laying area.

To locate the implantation of the dormant

To locate the implantation of the dormant

From a single block, the polyurethane frame fitted with a glazing installs flush with the roof. During a first fitting, locate the limits of implantation of the frame in relation to the rows of tiles.

Fix the profile and cut the underlay screen

Fix the profile and cut the underlay screen

Under the row of tiles covering the top of the frame, attach an L-shaped section with a slight slope. Cut the underlay screen and point it in the corner of the profile.

Apply the sealing lip

Apply the sealing lip

Put in place on the roof, the frame is first pointed by two screws. Then apply the flexible waterproofing membrane so that it matches the contours of the tiles.

Seal

Seal

Screw the frame on the high and low rails, previously slid under the tiles and attached to the rafters. Screwing on the battens completes the fixation.

Install the top row of tile

Install the top row of tile

One of the sides of the frame coincides with a bank of tile, which facilitates the installation. The upper row is easily installed: the foam seal folds by the simple weight of the tiles.

Reduce the height of the joint

Reduce the height of the joint

The row of tile that borders the other side of the frame is quite thin. In this case, reduce the height of the foam seal to the cutter to prevent it from lifting the tile.

Lay and glue the tiles

Lay and glue the tiles

Attach the two lengths of tiles cut. To glue them, lay a thick bead of roofing putty, lay the tiles by pressing firmly to adhere.

Lay the flexible duct

Lay the flexible duct

The frame is ready to receive the flexible duct. This choice is justified by the low height of the roof.

Cut out the ceiling

Cut out the ceiling

Gage of more brightness, the duct goes down vertically, without elbows. Cut out the ceiling to install the collar.

Engage and fix the collar

Engage and fix the collar

Engage the collar in the circular cutout, passing through the underside of the ceiling. Fasten it with four anchors that take the thickness of the ceiling sandwich.

Connect the flexible duct on the roof

Connect the flexible duct on the roof

First connect the flexible duct on the roof side. Unfold it and pass the low end into the ceiling flange.

Stomp the overflow

Stomp the overflow

Spoon over the cutter. Provide a cutting pliers to cut the hoop integrated in the hose.

Glue the bottom of the hose

Glue the bottom of the hose

Glue the bottom of the hose. You can also add an extra lighting kit.

Install the ceiling

Install the ceiling

All that remains is to install the ceiling lamp (acrylic double glazing) and its flange cover.